Crisp Bathroom Remodel

In the project, we changed the layout to be: a “wet area” concept.

Overview of the bathroom

Plumbing

We had to do a lot of plumbing adjustments such as relocating the drain of the shower, relocating the water lines of the tub, and more.

Additional Fixes:

We scraped off the popcorn ceiling. We got rid if the old and not modern wall paint color.

Guest bathroom photos